How to install guardrail forming equipment?
Feb 23, 2022
  There are many precautions when installing the guardrail forming equipment. If the installation is wrong, you may know that the machine cannot operate normally. If all pipes are installed/exposed to an environment that may freeze the piping system, insulation data and electric heating traces must be provided to prevent damage to the pipes and affect the operation of the system: All seismic supports should be reliably connected to the main body of the structure, and the pipes should pass through the building settlement joints The influence of uneven settlement should be considered when the mechanical and electrical engineering design other than buildings with seismic bearings does not require seismic calculation.

  Suspension screws may be omitted if two opposing rigid anti-vibration mounts are provided in the same position. When optimizing the integrated pipeline, the anti-seismic support has formulated the avoidance principle that can be by many parties: all professional pipelines installed on the integrated support and hanger follow the "small control large pipe, pressure control non-pressure pipe, weak current control strong current, flexible The general principle of regulating non-flexible pipes, pipes that do not require frequent maintenance, pipes that do not require frequent maintenance, that is, when the pipelines are arranged in parallel, the electrical equipment pipes are on the top layer, the ventilation and air conditioning ducts are on the middle layer, and all water pipes are on the bottom layer.

  Semi-automatic: If you touch it, it will switch between semi-automatic and full-automatic. If it is in full-automatic mode, it will flash green and "full-automatic" text. The semi-automatic working mode is to wait for pressing the external "start" button after finishing the material Confirm that the fully automatic working mode is to automatically process the current pipe fittings after the set feeding time;

  The position where the fixed point is set becomes the fixed bracket, and the relative displacement between the pipe rack and the pipe rack does not occur.

  Both ends of the pipeline shall be provided with transverse seismic supports. For steel pipes with a diameter greater than or equal to 200 mm, secondary hot dip galvanizing should be performed after installation. All pipes passing through building expansion joints are connected with metal bellows expansion joints. If all pipes are installed/exposed to an environment that may freeze the piping system, Insulation and electrical heating traces are provided to prevent damage to pipes and affect system operation.

  When there is a pipeline conflict, the family should be protected, the interference and collision of various professional pipelines should be dealt with, and conflicts such as air ducts, water pipes, cable trays, fire protection, water supply and drainage pipes, communication and signal trays should be coordinated.

  The skeleton produced by the greenhouse skeleton forming machine has excellent performance. It shows that the estimated value of H value obtained is basically consistent with the experimental results.

Leave A Message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

whatsapp